03.100.50 生产、生产管理 标准查询与下载



共找到 248 条与 生产、生产管理 相关的标准,共 17

本标准规定了缫丝企业的术语和定义、生产布局、生产基本条件、生产管理、质量管理与售后服务、综合能耗、环境保护与资源综合利用、安全生产与社会责任及监督管理等要求。本标准适用于中华人民共和国境内从事缫丝生产经营的企业。

Silk.Manufacturing management practice for reeling mill

ICS
03.100.50
CCS
W02
发布
2013-04-16
实施
2013-11-01

Demonstration Dairy Enterprise Production Management Standards

ICS
03.100.50
CCS
A01
发布
2013/02/15
实施
2013/02/15

The guideline presents 35 methods and the corresponding tools for lean production system (LPS) application in practice. These methods have been clustered according to the eight LPS principles, described VDI 2870 Part 1. This facilitates the systematic application of the methods.All methods are described in a standard method sheet. Besides a brief description, some general rules for the method's application are given. The method description is concluded with a presentation of typical and potential risks, and practical examples.

Lean production systems - List of methods

ICS
03.100.50
CCS
发布
2013-02
实施

Recommendation for schedule management - Requirements relating to a schedule management tool for the automotive industry - Standardized criterion catalog at detailed concept level

ICS
03.100.50
CCS
发布
2012-11
实施

Mit der VDI-Richtlinie wird ein Überblick über Ganzheitliche Produktionssysteme und eine Handlungshilfe zur Einführung gegeben. Die in der Richtlinie beschriebenen Gestaltungsprinzipien und Bewertungsmethoden und fokussieren vornehmlich auf die Anwendung innerhalb des Auftragsabwicklungsprozesses, mit den Teilprozessen Fertigung und Montage sowie den Unterstützungsprozessen Logistik, Human-Ressource-, Qualitäts- und Instandhaltungsmanagement.*www.vdi.de/2870

Lean production systems - Basic principles, introduction, and review

ICS
03.100.50
CCS
发布
2012-07
实施

Risk management. Implementation guide for organizational security measures and risk assessment. Incident identification

ICS
03.100.50
CCS
发布
2011-09-01
实施
2011-09-01

Risk management. Implementation guide for organizational security measures and risk assessment. Methodology for all-purpose event tree construction

ICS
03.100.50
CCS
发布
2011-09-01
实施
2011-09-01

Risk management. Implementation guide for organizational security measures and risk assessment. Reference incidents scenarios

ICS
03.100.50
CCS
发布
2011-09-01
实施
2011-09-01

The guideline describes the problems and procedures involved in modernizing and/or expanding existing materials-handling installations and logistical systems without causing any interruption to operations. It describes reasons for modernization and/or expansion and what needs to be done to ensure a successful changeover from "old" to "new".

Modernization and extension of conveyor-technical arrangements and logistic systems at running operation

ICS
03.100.50
CCS
发布
2011-08
实施

The company taken as our example distributes its footwear and textiles via two separate distribution centres. Insufficient flexibility in responding to fluctuating footwear or textile sales and performance limits being reached were the reasons for making a utilization analysis of the centres. The result was for both distribution centres to be integrated at a single location and for the remaining location to be used for special orders.

Modernization and extension of conveyor-technical arrangements and logistic systems at running operation - Integration and change of use by example of two distribution centres

ICS
03.100.50
CCS
发布
2011-08
实施

The guideline defines the terms of the availability and/or the efficiency for individual machines, system components and production overall systems. The approach to the regulation of downtimes, consequential failure times, allocation and utilization periods is described and explained on the basis of examples. It serves as work basis for treaty negotiations between users and machine/plant suppliers as well as for in-plant optimizations.

Technical availability of machines and production lines - Terms, definitions, determination of time periods and calculation

ICS
03.100.50
CCS
发布
2011-08
实施

Risk management. Implementation guide for organizational security measures and risk assessment. General methodology

ICS
03.100.50
CCS
发布
2011
实施
2011-09-01

本标准确定了全国电网名称的编码方法,电网的名称、简称及其相应的代码。 本标准适用于电力行业的管理、生产和科研等信息采集、交换和处理。

Power grid names code of state

ICS
03.100.50
CCS
F01
发布
2010-05-24
实施
2010-10-01

Risk management. Implementation guide for organizational security measures and risk assessment. Industrial incidents

ICS
03.100.50
CCS
发布
2010
实施
2011-09-01

本标准规定了散装水泥农村配送站工艺技术、设施设备和安装调试的要求。 本标准适用于县及县以下城市化规划的乡镇以外农村区域的新建、改造、扩建散装水泥农村配送站的设计和建设。

Code for technology of bulk cement deliver goods station of country

ICS
03.100.50
CCS
Q08;A01
发布
2008-12-29
实施
2009-08-01

Project risk management. General

ICS
03.100.50
CCS
A01
发布
2007
实施
2010-01-01

The focus of Operator Self-Verification is on traditional manufacturing operations, and applications can be made wherever traditional inspection is employed. The practices recommended in this document are intended to identify the basic elements and provide a guideline for structuring Operator Self-Verification programs within the aerospace industry; applicable to producers of commercial and military aircraft and weapons platforms, space vehicles, and all related hardware, software, electronics, engines and composite components. Operator Self-Verification programs are applied to improve the overall efficiency and product quality of processes considered mature, as judged by the implementing organization. Operator Self-Verification programs are not stand-alone processes, but augment existing quality management systems. The identified program elements are for voluntary implementation by the organization, and are not intended for contractual flow-down unless otherwise stipulated through contractual agreement.

Aerospace Operator Self-Verification Programs

ICS
03.100.50
CCS
V04
发布
2005-05-01
实施

Provides guidance on undertaking work process analysis for recordkeeping purposes.

Work process analysis for recordkeeping

ICS
03.100.50
CCS
发布
2003
实施

The document is intended to form the basis for, and provide asistance in, the further development of inhouse processes in the Course of the gradual changeover from function orientation to process orientation.

Processes and process orientation in production logistics - Example: Automotive Industry

ICS
03.100.50
CCS
发布
2001-08
实施

SAE J4001 provides instruction for evaluating levels of compliance to SAE J4000. Component text (Sections 4 to 9) from SAE J4000 is included for convenience during the evaluation process. Applicable definitions and references are contained in SAE J4000. SAE J4000 tests lean implementation within a manufacturing organization and includes those areas of direct overlap with the organizations suppliers and customers. If applied to each consecutive organizational link, an enterprise level evaluation can be made. SAE J4001 is to be applied on a specific component basis. Each of the fifty-two components tests part of, one, or multiples of the specific requirements of lean implementation. Implementation throughout an organization may be measured by evaluating all of the components. The level of compliance for each component relative to best practice may be used as a reference by an organization to compare itself to current best practice in establishing lean operation. Examples of current best practice are available in SAE publication RR003, Automotive Lean Enterprise Conversion Best Practice Examples. An organization may evaluate only selected components without affecting validity of results.

Implementation of Lean Operation User Manual

ICS
03.100.50
CCS
T02
发布
1999-11-01
实施
2000-02-09



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号