IEC 63132-2:2020: The purpose of this this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for installation of generator. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. This document applies to vertical generators according to IEC 60034-7. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Brushless excitation system is not included in this document. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
Guidance for installation procedures and tolerances of hydroelectric machines - Part 2: Vertical generators
IEC 63132-1:2020 The purpose of this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. Installations for refurbishment projects or for small hydro projects are not in the scope of this document. An agreement between all parties is necessary. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects
Hydraulic prestressed anchorage design specifications
Technical Guidelines for Dewatering and Control of River Channels Downstream of Small Hydropower Stations
Guidelines for the preparation of comprehensive analysis reports on safety production conditions and facilities for water conservancy and hydropower construction projects
Marine energy - Wave, tidal and other water current converters - Part 3: Measurement of mechanical loads
Guidance for installation procedures and tolerances of hydroelectric machines - Part 4: Vertical Kaplan or propeller turbines
Guidance for installation procedures and tolerances of hydroelectric machines - Part 3: Vertical Francis turbines or pump-turbines
Guidance for installation procedures and tolerances of hydroelectric machines - Part 2: Vertical generators
Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects
Technical specification for numerical simulation of debris flow in tailings dam break
本规范适用于水电工程场内交通道路设计
Design specifications for traffic roads within hydropower project sites
本规范适用于水电工程水土保持设计
Design specifications for soil and water conservation in hydropower projects
Regulations for Pit Exploration of Hydropower Projects
本规范适用于新建、改建、扩建的水电工程节能设计
Energy-saving design specifications for hydropower projects
本规程适用于新建、改建和扩建的水电工程从导流泄水建筑物开始下闸封堵至水库水位蓄至正常蓄水位时段水库蓄水应急预案的编制
Procedures for preparation of emergency plans for reservoir water storage in hydropower projects
本规程适用于大型水电工程坝址工程地质勘察。本规程不适用于中小型水电站工程坝址工程地质勘察
Engineering geological survey regulations for dam sites of hydropower projects
本规范适用于全国、区域、流域及河流(河段)水力资源的调查评价
Standards for survey and evaluation of water resources
本规范适用于新建、改建和扩建的水电工程岩基上的碾压混凝土拱坝设计
Design specifications for roller compacted concrete arch dams
本导则适用于水电工程设计、建设和运行阶段的可持续评价
Sustainable Hydropower Assessment Guidelines