93.160 水利建筑 标准查询与下载



共找到 684 条与 水利建筑 相关的标准,共 46

Jilin Provincial Water Conservancy Project Quota Part 2: Construction Project Budget Quota

ICS
93.160
CCS
P 59
发布
2017-06-12
实施
2017-08-12

Technical Guidelines for Coordinated Utilization of Water and Land Resources in Mountainous Areas

ICS
93.160
CCS
P 57
发布
2017-05-17
实施
2017-08-01

Construction quality acceptance assessment regulations for small and medium-sized water conservancy and hydropower engineering units Part 5: Hydraulic metal structure installation engineering

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Regulations for acceptance and assessment of construction quality of small and medium-sized water conservancy and hydropower engineering unit projects Part 6: Other projects

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Construction quality acceptance assessment regulations for small and medium-sized water conservancy and hydropower engineering unit works Part 2: Concrete works

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Regulations for acceptance and assessment of construction quality of small and medium-sized water conservancy and hydropower engineering unit works Part 4: Embankment works

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Construction quality acceptance assessment regulations for small and medium-sized water conservancy and hydropower engineering unit works Part 1: Earthwork works

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Construction Quality Acceptance Evaluation Regulations for Small and Medium-Sized Water Conservancy and Hydropower Project Unit Projects Part 3: Foundation Treatment and Foundation Engineering

ICS
93.160
CCS
P55
发布
2017-04-06
实施
2017-07-01

Construction Quality Acceptance Standards for Construction Engineering in Heilongjiang Province Construction Electrical Engineering

ICS
93.160
CCS
P 59
发布
2017-02-20
实施
2017-03-20

本标准根据《水利水电工程初步设计报告编制规程》SL 619和《水电工程可行性研究报告编制规程》DL/T 5020所要求的设计内容和设计深度,按其质量特性分类,规定了水利水电工程相应设计阶段设计产品质量的评定原则、评定方法和评定标准。 本标准共有5章和4个附录。主要包括以下内容: ——标准的适用范围; ——有关设计质量的术语; ——设计质量评定的要求; ——设计质量评定的基本原则; ——设计质量的评分办法; ——专业(章)质量评定和设计质量的总体评定等。

Standard for quality evaluation on design of water resources and hydropower project

ICS
93.160
CCS
N769
发布
2017-01-23
实施
2018-11-19

1.1 This test method describes an analytical procedure for determining the hydraulic efficiency of a production well in a confined aquifer. It involves comparing the actual drawdown in the well to the theoretical minimum drawdown achievable and is based upon data and aquifer coefficients obtained from a constant rate pumping test. 1.2 This analytical procedure is used in conjunction with the field procedure, Test Method D4050. 1.3 The values stated in inch-pound units are to be regarded as standard, except as noted below. The values given in parentheses are mathematical conversions to SI units, which are provided for information only and are not considered standard. 1.3.1 The gravitational system of inch-pound units is used when dealing with inch-pound units. In this system, the pound (lbf) represents a unit of force (weight), while the unit for mass is slugs. 1.4 Limitations—The limitations of the technique for determination of well efficiency are related primarily to the correspondence between the field situation and the simplifying assumption of this test method. 1.5 All observed and calculated values shall conform to the guidelines for significant digits and round established in Practice D6026, unless superseded by this standard. 1.5.1 The procedures used to specify how data are collected/ recorded or calculated, in this standard are regarded as the industry standard. In addition, they are representative of the significant digits that generally should be retained. The procedures used do not consider material variation, purpose for obtaining the data, special purpose studies, or any considerations for the user’s objectives; and it is common practice to increase or reduce significant digits of reported date to be commensurate with these considerations. It is beyond the scope of this standard to consider significant digits used in analysis method for engineering design. 1.6 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Standard Test Method (Analytical Procedure) for Determining the Efficiency of a Production Well in a Confined Aquifer from a Constant Rate Pumping Test

ICS
93.160
CCS
发布
2017-01-01
实施

1.1 This practice covers the methods for controlling drawdown and measuring discharge rates and head to analyze the hydraulic properties of an aquifer or aquifers. 1.2 This practice is used in conjunction with analytical procedures such as those of Jacob and Lohman (1)/(2),2 and Hantush (3). 1.3 The appropriate field and analytical procedures for determining hydraulic properties of aquifer systems are selected as described in Guide D4043. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 1.5 This practice offers a set of instructions for performing one or more specific operations. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this practice may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project’s many unique aspects. The word “Standard” in the title of this document means only that the document has been approved through the ASTM consensus process.

Standard Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems

ICS
93.160
CCS
发布
2017-01-01
实施

Ningxia Micro-irrigation Project Planning and Design Technical Guidelines

ICS
93.160
CCS
P55
发布
2016-12-28
实施
2017-03-28

Water Conservancy Project Construction Quality Evaluation Part 1: River Improvement

ICS
93.160
CCS
P56
发布
2016-12-21
实施
2017-04-01

Guidelines for the design of small and medium-sized rivers in cold regions

ICS
93.160
CCS
P 55
发布
2016-12-09
实施
2017-03-01

Technical specification for continuous willow-braided water erosion ditch treatment

ICS
93.160
CCS
P57
发布
2016-11-07
实施
2016-12-11

本标准规定了中稻本田期节水减排高产栽培灌溉技术的环境要求、移栽水稻的生育期划分、灌水深度、灌水间歇天数、田间蓄雨深度等要求。 本标准适用于安徽省移栽中稻种植地区。直播中稻在播种一个月后,可参照执行。

Water-saving and emission-reducing irrigation technical regulations for mid-season rice

ICS
93.160
CCS
P 55
发布
2016-09-27
实施
2016-10-27

本标准规定了中稻本田期干旱减产损失的评估方法和指标。利用断水天数法、土壤相对湿度法和水稻缺水率法三种方法评估水稻干旱减产损失。 本标准适用于江淮丘陵移栽中籼稻栽培种植地区。

Estimation Index of Drought Loss of Mid-season Rice in the Jianghuai Region

ICS
93.160
CCS
P 55
发布
2016-09-27
实施
2016-10-27

Water Conservancy Engineering Quality Supervision Regulations

ICS
93.160
CCS
P 55
发布
2016-09-07
实施
2016-12-06

General technical specifications for quick-assembled flood control retaining walls

ICS
93.160
CCS
P 58
发布
2016-08-15
实施
2016-10-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号