Labor. Part1926:Safety and health regulations for construction. Section1926.1:Purpose and scope.

Labor. Part1926:Safety and health regulations for construction. Section1926.1:Purpose and scope.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

A/D director (Assembly/Disassembly di-rector) means an individual who meets this subpart’s requirements for an A/D director, irrespective of the person's formal job title or whether the person is non-management or management personnel.

Labor. Part1926:Safety and health regulations for construction. Section1926.1401:Definitions.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Definitions.

Labor. Part1926:Safety and health regulations for construction. Section1926.1402:Ground conditions.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

When assembling or disassembling equipment (or attachments), the em-ployer must comply with all applicable manufacturer prohibitions and must comply with either:

Labor. Part1926:Safety and health regulations for construction. Section1926.1403:Assembly/Disassembly—selection of manufacturer or employer procedures.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Supervision—competent-qualified person. (1) Assembly/disassembly must be directed by a person who meets the criteria for both a competent person and a qualified person, or by a com-petent person who is assisted by one or more qualified persons (''A/D direc-tor'').

Labor. Part1926:Safety and health regulations for construction. Section1926.1404:Assembly/Disassembly— general requirements (applies to all assembly and disassembly operations).

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Guarding and ventilating street opening used for access to underground lines or equipment. (1) Appropriate warning signs shall be promptly placed when covers of manholes, handholes, or vaults are removed. What is an appro-priate warning sign is dependent upon the nature and location of the hazards involved.

Labor. Part1926:Safety and health regulations for construction. Section1926.956:Underground lines.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Work near energized equipment fa-cilities. (1) When construction work is performed in an energized substation, authorization shall be obtained from the designated, authorized person be-

Labor. Part1926:Safety and health regulations for construction. Section1926.957:Construction in energized substations.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

In all operations performed using a rotorcraft for moving or placing exter-nal loads, the provisions of § 1926.551 of subpart N of this part shall be complied with.

Labor. Part1926:Safety and health regulations for construction. Section1926.958:External load helicopters.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) General requirements. The require-ments of paragraphs (a) and (b) of thissection shall be complied with for alllineman's body belts, safety straps andlanyards acquired for use after the ef-fective date of this subpart.

Labor. Part1926:Safety and health regulations for construction. Section1926.959:Lineman's body belts, safety straps, and lanyards.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Alive or live (energized). The term means electrically connected to a source of potential difference, or elec-trically charged so as to have a poten-tial significantly different from that of the earth in the vicinity. The term ''live'' is sometimes used in place of the term ''current-carrying,''where the intent is clear, to avoid repetition of the longer term.

Labor. Part1926:Safety and health regulations for construction. Section1926.960:Definitions applicable to this subpart.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

Safety-toe footwear for employees shall meet the requirements and speci-fications in American National Stand-ard for Men’s Safety-Toe Footwear, Z41.1–1967.

Labor. Part1926:Safety and health regulations for construction. Section1926.96:Occupational foot protection.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Design requirements for specific types of electrical protective equipment. Rubber insulating blankets, rubber in-sulating matting, rubber insulating covers, rubber insulating line hose, rubber insulating gloves, and rubber in-sulating sleeves shall meet the fol-lowing requirements:

Labor. Part1926:Safety and health regulations for construction. Section1926.97:Electrical protective equip-ment.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

The following training provisions supplement and clarify the require-ments of § 1926.21 regarding the hazards addressed in subpart M of this part.

Labor. Part1926:Safety and health regulations for construction. Section1926.503:Training requirements.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

Labor. Part1926:Safety and health regulations for construction. Section1926.5:OMB control numbers under the Pa-perwork Reduction Act.

Labor. Part1926:Safety and health regulations for construction. Section1926.5:OMB control numbers under the Pa-perwork Reduction Act.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

Labor. Part1926:Safety and health regulations for construction. Section1926.6:Incorporation by reference.

Labor. Part1926:Safety and health regulations for construction. Section1926.6:Incorporation by reference.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Application. The occupational safety and health standards contained in this subpart V shall apply to the construction of electric transmission and distribution lines and equipment.

Labor. Part1926:Safety and health regulations for construction. Section1926.950:General requirements.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Protective equipment. (1)(i) Rubber protective equipment shall be in ac-cordance with the provisions of the American National Standards Institute (ANSI), ANSI J6 series, as follows:

Labor. Part1926:Safety and health regulations for construction. Section1926.951:Tools and protective equip-ment.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Application. Protective equipment, including personal protective equip-ment for eyes, face, head, and extrem-ities, protective clothing, respiratory devices, and protective shields and bar-riers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or envi-ronment, chemical hazards, radio-logical hazards, or mechanical irri-tnts encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.

Labor. Part1926:Safety and health regulations for construction. Section1926.95:Criteria for personal protetive equipment.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) General. (1) Visual inspections shall be made of the equipment to de-termine that it is in good condition each day the equipment is to be used.

Labor. Part1926:Safety and health regulations for construction. Section1926.952:Mechanical equipment.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Unloading. Prior to unloading steel, poles, cross arms and similar ma-terial, the load shall be thoroughly ex-amined to ascertain if the load has shifted, binders or stakes have broken or the load is otherwise hazardous to employees.

Labor. Part1926:Safety and health regulations for construction. Section1926.953:Material handling.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved