P02 经济管理 标准查询与下载



共找到 318 条与 经济管理 相关的标准,共 22

Construction procurement. Formatting and compilation of procurement documentation

ICS
91.010.20
CCS
P02
发布
2011-09-30
实施
2011-09-30

Construction procurement. Processes, methods and procedures

ICS
91.010.20
CCS
P02
发布
2011-09-30
实施
2011-09-30

This British Standard gives recommendations and guidance on the development within a public or private sector organization of policies, strategies and procedures for the procurement of construction in the built environment using the structure shown in Figure 1. It does not cover the procurement of associated engineering services and offshore construction works or the procurement of facilities management as a stand alone service.

Construction procurement policies, strategies and procedures. Code of practice

ICS
03.100.99
CCS
P02
发布
2011-08-31
实施
2011-08-31

Buildings and constructed assets. Service life planning. General principles and framework

ICS
91.040.01
CCS
P02
发布
2011-07-31
实施
2011-07-31

本标准规定了矿山地质环境保护与恢复治理方案编制的术语和定义、总则、工作程序及技术要求。 本标准适用于新建、改(扩)建及生产矿山的矿山地质环境保护与恢复治理方案的编制,闭坑矿山的矿山地质环境保护与恢复治理方案的编制可参照执行。

Compiling code on the project of mining geo-environmental protection and integrated renovation

ICS
CCS
P02
发布
2011-07-07
实施
2011-08-31

Buildings and constructed assets - Service life planning - Part 1 : general priciples and framework.

ICS
91.040.01
CCS
P02
发布
2011-07-01
实施
2011-07-15

本规程规定了基本农田划定(补划)的任务、原则、实施主体、技术方法、技术要求、流程、成果规范等。 本标准适用于依据土地利用总体规划开展的基本农田划定,以及在土地利用总体规划实施过程中,依法批准建设占用基本农田或因依法认定的其他原因造成基本农田减少的补划工作。

Guideline for designation of capital farmland

ICS
CCS
P02
发布
2011-06-02
实施
2011-06-30

TD/T 1031的本部分规定了石油天然气(含煤层气)生产建设活动损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 本部分适用于下列有土地损毁的项目的土地复垦方案编制: --已取得采矿权的油气项目; --申请新立、延续、变更、注销采矿权的油气项目; --已取得、申请新立、延续、变更、注销探矿权的油气勘探项目,按规定需要编制土地复垦方案的项目,参考本部分。探矿权转为采矿权的项目,可整合到相应的采矿权项目的土地复垦方案中。 --法律规定的其他造成土地损毁的跨省域油气长输管道建设、油气勘探、炼油化工等,作为单独选址的能源建设项目,土地复垦方案编制适用TD/T 1031.6《土地复垦方案编制规程 第6部分:建设项目》,结合参考本部分的相关规定。

Regulation on compiling land reclamation plan.Part 5:Petroleum and natural gas (including coal-bed gas)

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了建设项目损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。

Regulation on compiling land reclamation plan.Part 6:Construction projects

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了生产建设活动损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 本部分适用于以下损毁类型的土地复垦方案编制: --露天采矿、烧制砖瓦、挖沙取土等地表挖掘所损毁的土地; --地下采矿等造成地表塌陷的土地; --堆放采矿剥离物、废石、矿渣、粉煤灰、冶炼渣等固体废弃物压占的土地; --能源、交通、水利等基础设施建设和其他生产建设活动临时占用所损毁的土地; --法律规定的其他生产建设活动造成损毁的土地。

Regulation on compiling land reclamation plan.Part 1:General rules

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了露天开采煤矿损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 烧制砖瓦、采石场、采砂场等地表挖掘、压占造成损毁土地的复垦方案编制可参照本部分执行。

Regulation on compiling land reclamation plan.Part 2:Opencast coalmine

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了井工开采煤矿损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 非煤井工矿山开采损毁土地复垦方案编制可参照本部分执行。

Regulation on compliling land reclamation plan.Part 3:Underground coalmine

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了金属矿开采损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 非金属矿山开采损毁土地复垦方案编制可参照本部分执行。

Regulation on compiling land reclamation plan.Part 4:Metal mine

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

TD/T 1031的本部分规定了铀矿开采损毁土地复垦方案编制的总则、程序、方法、内容和成果要求。 其他伴生放射性矿开采项目损毁土地复垦方案编制可参照本部分执行。

Regulation on compiling land reclamation plan.Part 7:Uranium mine

ICS
CCS
P02
发布
2011-05-04
实施
2011-05-31

This part of ISO 10845 establishes a key performance indicator, in the form of a contract participation goal (CPG), relating to the engagement of targeted enterprises on a contract for the provision of goods, services or engineering and construction works. A CPG may be used to measure the outcomes of a contract in relation to the engagement of targeted enterprises or to establish a target level of performance for the contractor to achieve or exceed in the performance of a contract. This part of ISO 10845 sets out the methods by which the key performance indicator is measured, quantified and verified in the performance of the contract with respect to two different targeting strategies: targeting strategy A and targeting strategy B (defined in Clause 2). NOTE Annex A contains a commentary on the clauses in this part of ISO 10845. Annex B provides guidance on how to develop the targeting data for a procurement document using this part of ISO 10845.

Construction procurement - Part 5: Participation of targeted enterprises in contracts

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15

This part of ISO 10845 establishes a key performance indicator, in the form of a contract participation goal, relating to the engagement of targeted partners in a joint venture on a contract for the provision of goods, services or engineering and construction works. A contract participation goal may be used to measure the outcomes of a contract in relation to the engagement of targeted partners in a joint venture or to establish a target level of performance for the contractor to achieve or exceed in the performance of a contract. This part of ISO 10845 sets out the methods by which the key performance indicator can be measured, quantified and verified in the performance of the contract in respect of two different targeting strategies: targeting strategy A and targeting strategy B (defined below). NOTE Annex A contains commentary on the clauses in this part of ISO 10845. Annex B provides guidance on how to develop the targeting data for a procurement document using this part of ISO 10845.

Construction procurement.Part 6: Participation of targeted partners in joint ventures in contracts

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15

This part of ISO 10845 establishes a key performance indicator in the form of a contract participation goal (CPG) relating to the engagement of local enterprises and labour on a contract for the provision of services or engineering and construction works. A CPG may be used to measure the outcomes of a contract in relation to the engagement of local enterprises and labour or to establish a target level of performance for the contractor to achieve or exceed in the performance of a contract. This part of ISO 10845 sets out the methods by which the key performance indicator is measured, quantified and verified in the performance of the contract in respect of two different targeting strategies: targeting strategy A and targeting strategy B. NOTE Annex A contains commentary on the clauses in this part of ISO 10845. Annex B provides guidance on how to develop the targeting data for a procurement document using this part of ISO 10845.

Construction procurement - Part 7: Participation of local enterprises and labour in contracts

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15

This part of ISO 10845 establishes, in respect of supply, services and engineering and construction works contracts, at both main and subcontract levels, a) a format for the compilation of 1) calls for expressions of interest, 2) tender and contract documents, and b) the general principles for compiling procurement documents. NOTE 1 Annex A contains commentary on the clauses in this part of ISO 10845. NOTE 2 This International Standard can also be used, with some adaptation, in the formatting and compilation of concession contracts and contracts involving disposals. NOTE 3 Annex G of ISO 10845-1 provides guidance on the development of auction data.

Construction procurement.Part 2:Formatting and compilation of procurement documentation

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15

This part of ISO 10845 sets out standard conditions of tender which a) bind the employer and tenderer to behave in a particular manner, b) establish what a tenderer is required to do in order to submit a compliant tender, c) make known the evaluation criteria to tenderers, and d) establish the manner in which the employer conducts the process of offer and acceptance and provide the necessary feedback to tenderers on the outcomes of the process. This part of ISO 10845 is intended for use in procurements relating to goods, services and construction works and disposals other than by auction. NOTE 1 Annex A contains commentary on the clauses in this part of ISO 10845. Annex B provides guidance on how to develop the tender data for a procurement document using this part of ISO 10845. NOTE 2 ISO 10845-2 establishes the manner in which procurement documents should be formatted and compiled. The standard conditions contained in this part of ISO 10845 may by reference be incorporated in procurement documents formatted and compiled in accordance with the provisions of ISO 10845-2.

Construction procurement - Part 3: Standard conditions of tender

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15

This part of ISO 10845 sets out standard conditions for the calling for expressions of interest which a) bind the employer and respondent to behave in a particular manner, b) establish what is required for a respondent to submit a compliant submission, c) make known to respondents the evaluation criteria, and d) establish the manner in which the employer conducts the process of calling for expressions of interest. This part of ISO 10845 is intended for use in procurements relating to goods, services and construction works and certain disposals other than by auction. NOTE 1 Annex A contains commentary on the clauses in this part of ISO 10845. Annex B provides guidance on how to develop the submission data for a call for expressions of interest using this part of ISO 10845. NOTE 2 ISO 10845-2 establishes the manner in which calls for expressions of interest should be formatted and compiled. The standard conditions contained in this part of ISO 10845 can, by reference, be incorporated in procurement documents formatted and compiled in accordance with the provisions of ISO 10845-2.

Construction procurement.Part 4: Standard conditions for the calling for expressions of interest

ICS
91.010.20
CCS
P02
发布
2011-01-15
实施
2011-01-15



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号