P59 水电工程 标准查询与下载



共找到 729 条与 水电工程 相关的标准,共 49

本标准规定了在钻孔内进行土的工程性质的试验方法。本标准适用于水电水利工程测定地基、边坡、地下洞室、填筑土料等土的工程性质在钻孔内的试验,以及对施工质量的控制和检验。

Code for soil tests in borehole of hydroelectric and water conservancy engineering

ICS
27.140
CCS
P59
发布
2006-12-17
实施
2007-05-01

本标准规定了沥青、填料、细骨料、粗骨料和沥青混凝土试验方法。 本标准适用于水电水利工程沥青混凝土。

Test code for hydraulic bitumen concrete

ICS
93.020
CCS
P59
发布
2006-12-17
实施
2007-05-01

本标准规定了水工碾压式沥青混凝土施工行为和质量的基本要求。 本标准适用于大、中型水电水利工程的碾压式沥青混凝土施工,其他类似工程可参照执行。

Specincations for construction of hydraulic roller compacted bituminous concrete

ICS
27.140
CCS
P59
发布
2006-12-17
实施
2007-05-01

本标准规定了水电水利工程施工导截流模型试验的基本要求。 本标准适用于大中型水电水利工程施工导截流模型试验,其他类似工程可参照执行。

Code for model test of river diversion and closure during construction for hydropower & hydraulic engineering

ICS
93.020
CCS
P59
发布
2006-12-17
实施
2007-05-01

本标准规定了梯级水电厂集中监控工程设计的基本要求。 本标准适用于总装机容量在100MW~2400MW范围内的大中型梯级水电厂集中监控工程设计。

Design specification for centralized monitoring and control projects of valley hydropower plants

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准对水电水利工程水工建筑常用图的表达方法和主要内容作出规定,主要包括规划图、水工建筑及施工图、钢筋混凝土结构图、木结构图、钢结构图及与施工安装有关图样的画法和内容。 本标准适用于水电水利工程各阶段工程图样的制图,以及有关技术文件的编写。

Drawing standard for hydraulic stmctum of hydropower and water conservancy project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准对水电水利工程制图的基本要求、图样画法、标注方法等作出了规定。 本标准适用于水电水利工程各专业、各设计阶段工程图样的制图以及有关技术文件的编写。

Drawing standard for base of hydropower and water conservancy project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准规定了水电水利工程水力机械及金属结构制图的技术要求、图例及图式。 本标准适用于水电水利工程水力机械及金属结构制图。

Drawing standard for hydraulic machinery of hydropower and water conservancy project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准规定了拱坝设计的主要技术原则。 本标准适用于新建和改建的大、中型水电水利工程岩基上的1、2、3级混凝土拱坝的设计。坝高大于200m或有特殊问题的拱坝,应对有关问题作专门研究论证。 4、5级混凝土拱坝和碾压混凝土拱坝的设计可参照执行。

Design specification for concrete arch dams

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准规定了水电水利工程电气制图方法,以保证图面质量,满足设计、施工、生产和科研的要求。 本标准适用于水力发电厂、抽水蓄能电厂、泵站、变电所的新建、扩建工程。

Drawing standard of electrical engineering for hydropower and water resources project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准规定了水电水利工程地质制图的技术要求、图例及图式。 本标准适用于水电水利工程地质勘察的地质制图。

Drawing standard of geologic for hydropower and water resources project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

本标准规定了水电水利工程枢纽主要建筑物边坡、近坝库岸边坡设计的安全级别、设计安全标准、稳定分析方法、综合治理措施以及安全监测、预警等内容。 本标准适用于大、中型水电水利工程枢纽主要建筑物边坡、近坝库岸影响工程正常、安全运行的自然边坡的治理设计。水库区其他边坡工程的设计参照执行。 对超大规模的边坡、特别重要的或条件十分复杂的边坡,其安全设计标准、稳定分析及其评价、综合治理措施等要进行专门研究论证。

Design specification for slope of hydropower and water conservancy project

ICS
27.140
CCS
P59
发布
2006-09-14
实施
2007-03-01

Serves as a reference document for practicing engineers in the hydroelectric industry. It documents prevailing industry practices in hydroelectric power plant control system logic, control system configurations, and control modes. It describes the control and monitoring requirements for equipment and systems associated with conventional and pumped-storage hydroelectric plants. It includes typical methods of local and remote control, details of the control interfaces for plant equipment, requirements for centralized and off-site control.

Guide for Control of Hydroelectric Power Plants

ICS
27.140
CCS
P59
发布
2006-08-18
实施

Serves as a reference document for practicing engineers in the hydroelectric industry. It documents prevailing industry practices in hydroelectric power plant control system logic, control system configurations, and control modes. It describes the control and monitoring requirements for equipment and systems associated with conventional and pumped-storage hydroelectric plants. It includes typical methods of local and remote control, details of the control interfaces for plant equipment, requirements for centralized and off-site control.

Guide for Control of Hydroelectric Power Plants

ICS
27.100
CCS
P59
发布
2006-08-14
实施

本规范适用于大、中型水利水电工程中的2级、3级砌石坝或坝高超过50m的4级、5级砌石坝的设计。其他砌石坝设计可参照使用。 对于坝高超过100m的砌石坝,设计时应进行必要的专题研究。

Design specification for stone masonry dam

ICS
93.160
CCS
P59
发布
2006-04-12
实施
2006-06-01

Describes alternatives hydroelectric power plant owners should consider when undertaking a rehabilitation of the facilities.

Guide for the Rehabilitation of Hydroelectric Power Plants

ICS
27.140
CCS
P59
发布
2006-01-26
实施

本标准规定了水电水利工程地质勘察中的钻孔压水试验的工作内容、试验方法和技术要求。 本标准适用于水电水利工程地质勘察中的常规钻孔压水试验。

Code of water pressure test in borehole for hydropower and water resources engineering

ICS
27.140
CCS
P59
发布
2005-11-28
实施
2006-06-01

本标准规定了水力发电厂电力电缆工程的设计要求。 本标准适用于新建的水力发电厂(以下简称水电厂)电压为110kV~500kV、频率为50Hz的电力电缆工程的选择与敷设设计。对于扩建或改建的电力电缆工程可参照执行。

Code for design of AC 100kV~500kV power cable systems for hydro-power station

ICS
27.140
CCS
P59
发布
2005-11-28
实施
2006-06-01

本标准规定了水电水利工程水工混凝土及砂浆配合比的设计方法。 本标准适用于水电水利工程水工混凝土及砂浆配合比设计方法。

Code for mix design of hydraulic concrete

ICS
93.020
CCS
P59
发布
2005-11-28
实施
2006-06-01

本标准规定了水工混凝土Ⅰ型断裂韧度试验的标准测试方法。 本标准适用于大中型水电水利工程常态混凝土和碾压混凝土,其他工程可参照使用。

Norm for fracture test of hydraulic concrete

ICS
93.020
CCS
P59
发布
2005-11-28
实施
2006-06-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号