P59 水电工程 标准查询与下载



共找到 729 条与 水电工程 相关的标准,共 49

本标准适用于大型、中型水利水电工程项目的项目建议书、可行性研究和初步设计阶段的设计工程量计算。

Specification for design quantity calculation of water resources and hydropower engineering

ICS
93.160
CCS
P59
发布
2005-11-15
实施
2006-01-01

This International Standard deals with the definition and the characteristics of control systems and is the basis for tender documents and technical tenders. It is not limited to the actual controller tasks but also include other tasks which may be assigned to a control system, such as for instance sequence control tasks, safety, provision for the actuating energy. The testing of control systems for hydro turbines can generally fulfil the following tasks: – verification of system characteristics as per contract specification; – verification of general proper functioning in the workshop and/or on site; – tests to prove the fulfilment of guarantees; – assessment of the actual state of an existing control system with regard to the question of repair or replacement. This standard covers the following systems: – speed, power, opening, water level and flow control for all turbine types; – electronic, electrical and fluid power devices; – safety devices; – start-up, shutdown devices etc.

Hydraulic turbines - Testing of control systems

ICS
27.140
CCS
P59
发布
2005-10-31
实施
2005-10-31

本标准适用于装机容量1~50MW的农村水电站工程的环境影响评价,不适用于综合利用工程中的小水电。

Environmental impact assessment code hydroelectric station project for rural area

ICS
27.140
CCS
P59
发布
2005-05-20
实施
2005-09-01

本标准适用于江、河、湖、海的1级、2级、3级堤防、穿堤涵闸、堤岸的工程地质勘察。江、河、湖、海的4级、5级堤防的工程地质勘察可参照执行。

Code of geological investigation for levee project

ICS
27.140
CCS
P59
发布
2005-04-18
实施
2005-07-01

本标准适用于中小型水利水电工程地质勘察和中小型病险水库除险加固工程勘察。 工程地质条件复杂,且坝高超过70m的中型水利水电工程,其工程地质勘察宜按《水利水电工程地质勘察规范》(GB 50287-1999)执行。

Specification of engineering geological investigation for medium-small water conservancy and hydropower development

ICS
27.140
CCS
P59
发布
2005-04-18
实施
2005-07-01

本标准适用于水利水电工程地质勘察中的钻孔抽水试验工作。

Code of pumping test in borehole for water resources and hydropower engineering

ICS
27.140
CCS
P59
发布
2005-04-18
实施
2005-07-01

本标准规定了大坝安全监测自动化系统的设计、系统的功能和性能要求、系统设备的检验方法和检验规则、系统设备的包装储运要求、系统安装调试、系统验收及运行维护要求等。 本标准适用于水电水利Ⅰ、Ⅱ、Ⅲ等工程安全监测自动化系统。其他工程安全监测自动化系统可参照使用。

Technical specification for dam safety monitoring automation

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了水电水利工程地质勘察中钻孔抽水试验的基本规定、试验设备、技术要求和计算方法。 本标准适用于水电水利工程地质勘察中进行的单孔和多孔抽水试验。竖井、试坑抽水试验可参照执行。

Code of pumping test in borehole for hydropower and water conservancy engineering

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了水电水利工程振冲法地基处理工程的设计、施工、质量控制、检测与验收,其他振冲法地基处理工程可参照使用。 本标准适用于振冲法施工处理深度20m以内的工程,处理深度超过20m时可参照本标准执行。

Technical specification for vibroflotation ground treatment of hydroelectric and water resources projects

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了止水带的型式、尺寸、材质和施工要求。   本标准适用于水电水利枢纽工程中1、2、3级和坝高70m以上的4、5级混凝土拱坝、重力坝、面板坝及溢洪道、厂房、水闸、隧洞、渡槽等工程,其他混凝土坝、面板坝及永久水工建筑物可参照使用。对于坝高200m以上的混凝土面板堆石坝或有特殊要求的混凝土坝、面板堆石坝及其他水工建筑物,其止水带型式、尺寸、材质和施工,应进行专门研究。

Specification for waterstop of hydraulic structure

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了水电工程预可行性研究报告应遵循的原则、工作程序、工作内容、工作深度以及报告编写要求。 本标准适用于新建、扩建的大中型水电站和抽水蓄能电站工程(以下统称水电工程)预可行性研究报告的编制。

Code on compiling pre-feasibility study report of hydropower project

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了水电水利工程施工的开挖工程(含疏浚工程)、地基及基础工程、混凝土工程(含混凝土预制构件吊装、坝体接缝灌浆工程)的单元工程质量等级评定标准。   本标准适用于大中型水电水利工程单元工程质量等级的评定。小型水电水利工程可参照执行。

Quality degree evaluate standard of unit engineering for hydro power and water conservancy construction engineering Part 1: Civil department

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了抽水蓄能电站工程勘测设计的指导原则和技术要求。 本标准适用于大中型抽水蓄能电站工程的设计。对混合式抽水蓄能电站给出设计的主要原则。小型抽水蓄能电站的设计可参照执行。

Design guide for pumped storage power station

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了混凝土坝安全监测资料整理和整编的基本要求。 本标准适用于混凝土坝巡视检查、环境量、变形、渗流、应力应变及温度(包括水温)等主要监测项目的整编。其他专项监测项目,可根据具体情况和需要参照本标准进行。

Data compilation code for concrete dam safety monitoring

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

Technical specification for abrasion and cavitation resistance of concrete in hydraulic structures

ICS
93.160
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准规定了水电工程招标设计报告编制的原则、工作内容和深度,以及报告的编写要求。本标准适用于新建、扩建的大、中型常规水电站和抽水蓄能电站工程招标设计报告的编制。中型水电工程视需要可适当简化,己建水电站的改建、加固工程及小型水电工程可参照使用。

Code on compiling tender design report of hydropower projects

ICS
27.140
CCS
P59
发布
2005-02-14
实施
2005-06-01

本标准适用于符合下列亲件的各类排灌及供水泵站的安全鉴定: 1 总装机功率1000kW及以上或总量l0m3/s及以上的泵站; 2 水泵叶轮直径900mm及以上或单机功率300kW及以上的轴流泵和混流泵泵站; 3 水泵进口直径500mm及以上或单机功率500kW及以上的离心泵泵站。 其他泵站的安全鉴定,可参照执行。

Code of practice for safety appraisal of pumping station

ICS
27.140
CCS
P59
发布
2005-01-12
实施
2005-03-01

This standard sets down guidelines for the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. Finally, case studies of actual computer-based automatic control applications are presented. The automation of control and data logging functions has relieved the plant operator of these tasks, allowing the operator more time to concentrate on other duties. In many cases, the plant's operating costs can be significantly reduced by automation (primarily via staff reduction) while still maintaining a high level of unit control reliability. Automatic control systems for hydroelectric units based on electromechanical relay logic have been in general use for a number of years and, in fact, were considered standard practice for the industry. Within the last decade, microprocessor-based controllers have become available that are suitable for operation in a power plant environment. These computer-based systems have been applied for data logging, alarm monitoring, and unit and plant control. Advantages of computer-based control include use of graphical user interfaces, the incorporation of sequence of events and trending into the control system, the incorporation of artificial intelligence and expert system capabilities, and reduced plant life cycle cost.

Hydroelectric power plant automation - Guide for computer-based control

ICS
27.140
CCS
P59
发布
2004-12-14
实施
2004-12-14

Code for the construction of crane girders anchored to rock face for hydropower and water resources projects

ICS
27.140
CCS
P59
发布
2004-10-20
实施
2005-04-01

Technical code for designing coal handling of fossil fuel power plant Part 2: Dust prevention and control

ICS
27.100
CCS
P59
发布
2004-10-20
实施
2005-04-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号