This guide provides considerations for the pre-installation@ installation@ inspection@ and testing of Class 1E power@ instrumentation@ and control equipment and systems of a nuclear facility while in the process of installing@ inspecting@ and testing during new construction@ modification@ and maintenance. This guidance is applicable to initial construction@ modification (backfit)@ and maintenance activities. This guide does not apply to periodic testing. Purpose The purpose of this recommended practice is to identify the activities@ instructions@ and attributes that should be considered in the process of installing@ inspecting@ and testing during new construction@ modification@ and maintenance for Class 1E power@ instrumentation@ and control equipment at nuclear facilities.
336-2010由IEEE - The Institute of Electrical and Electronics Engineers@ Inc. 发布于 2010-06-17,并于 2010-10-06 实施。
非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 336-2010 前三页,或者稍后再访问。
点击下载后,生成下载文件时间比较长,请耐心等待......
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号