BS EN 50341-2-18:2023由英国标准学会 GB-BSI 发布于 2023-08-31,并于 2023-08-31 实施。
。
1 Scope (ncpt) SE.1 Application to existing overhead lines This Part 2-18 is applicable for new overhead lines only and not for existing lines. (A-dev) SE.2 Maintenance, rebuilding or extension of an overhead line Measures related to maintenance of the electrical installation shall fulfill the legislation in force when it was erected. In the case of a rebuilding or extension of an electrical installation (overhead line), the current regulations in force shall be applied for the rebuilding or extension. (Regulations and general advice of the National Electrical Safety Board regarding the installation of electrical installations ”Elsäkerhetsverkets föreskrifter och allmänna råd om hur starkströmsanläggningar ska vara utförda”, Ikraftträdande och övergångsbestämmelser (ELSÄK‑FS 2022:1)) (ncpt) SE.3 Optical ground wire (OPGW) and optical phase conductor (OPCON) This Part 2-18 is applicable for installation of OPGW and OPCON, also known as OPPC, in overhead lines in Sweden. (ncpt) SE.4 All dielectric self supporting optical cable (ADSS) and optical attached cable (OPAC) This Part 2-18 is applicable for installation of ADSS and OPAC in overhead lines in Sweden. NOTE The allowable electrical field for the ADSS cable should be taken into consideration when the cond...
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号