ASTM F3563-22
大型固定翼无人机系统的设计和建造标准规范

Standard Specification for Design and Construction of Large Fixed Wing Unmanned Aircraft Systems


ASTM F3563-22

标准号
ASTM F3563-22
发布
2022年
发布单位
美国材料与试验协会
当前最新
ASTM F3563-22
 
 
引用标准
ASTM F2490 ASTM F3060 ASTM F3061/F3061M ASTM F3062/F3062M ASTM F3063/F3063M ASTM F3064/F3064M ASTM F3065/F3065M ASTM F3066/F3066M ASTM F3082/F3082M ASTM F3083/F3083M ASTM F3093/F3093M ASTM F3114 ASTM F3115/F3115M ASTM F3116/F3116M ASTM F3117/F3117M ASTM F3120/F3120M ASTM F3173/F3173M ASTM F3174/F3174M ASTM F3179/F3179M ASTM F3180/F3180M ASTM F3227/F3227M ASTM F3228 ASTM F3229/F3229M ASTM F3230 ASTM F3231/F3231M ASTM F3232/F3232M ASTM F3233/F3233M ASTM F3234/F3234M ASTM F3235 ASTM F3236 ASTM F3239 ASTM F3254 ASTM F3264 ASTM F3298 ASTM F3309/F3309M ASTM F3316/F3316M ASTM F3331 ASTM F3341/F3341M ASTM F3367
1.1 适用性: 1.1.1 本规范确定了经协商一致确定的行业标准,以证明符合无人机系统(UAS)的要求(“规则”)。 1.1.2 本规范不适用于载有乘客或机组人员的无人机系统。 1.1.3 以下内容不属于本设计和建造规范的范围:垂直起降(VTOL)或混合动力飞机、载有无人机的乘客或机组人员、水上飞机或两栖飞机、经过特技飞行认证的无人机、符合规范 F3298...

ASTM F3563-22相似标准


推荐

成飞自贡无人机产业基地正式投产

启动仪式后,龙-2无人机从产业基地自贡兰田机场起飞,跨空域执行支线物流飞行试验任务,在3000米内低空空域,飞至乐山目标任务区,耗时15分钟,具有快速装卸能力。此前,这架龙-2无人机已获得全国首张4吨级大型固定无人机特许飞行证,符合中国民航最新法规标准认可,能在特许条件下安全地开展飞行活动,为后续拓展翼龙无人机在跨省跨区支线运输、应急救援、气象探测等低空场景应用提供了重要适航资质支撑。...

工信部:我国主导制定两项无人机领域国际标准发布

《民用多旋无人机系统试验方法》规定了民用多旋无人机系统及部件试验方法,适用于民用多旋无人机系统及部件设计、制造、检测认证,可直接指导多旋无人机研制生产工作。《轻小型无人机用电动能源系统技术要求》规定了轻小型无人机用电动能源系统技术要求和试验方法,能够为轻小型无人机用电动能源系统研制、生产试验提供参考。...

国产大型四发无人机在四川成功首飞

原文地址:http://news.sciencenet.cn/htmlnews/2022/10/488453.shtm 近日,由我国自主研发,并拥有完全知识产权大型四发无人机在四川成功首飞。 据了解,此次成功首飞“双尾蝎D”是全球首款大型四发、多用途、中空长航时固定无人机系统。...

深圳无人机“飞”出国外,欧美大地再“战”深圳无人机

超过140多家囯内外无人机企业携带近600架各种类型无人机及其配件产品扎堆亮相,产品涵盖无人直升机、无人固定机、无人多旋飞行器、无人飞艇、无人伞机、扑式微型无人机及上下游配套产品等,品类众多,新品突出,技术新颖,现场让人叹为观止。近50000名观众冒雨前来学习新技术,了解新产品寻找商机。...


谁引用了ASTM F3563-22 更多引用





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号