SAE J 4000-1999
实行精益运营的最佳方法确认和测量

Identification and Measurement of Best Practice in Implementation of Lean Operation


SAE J 4000-1999 发布历史

SAE J4000 is a tool to identify and measure best practice in the implementation of lean operation in a manufacturing organization. Implementation of lean operation is defined as the process of eliminating waste exhibited in an organizations value stream. Best practice in this process is Level 3 conduct as described in the standards component statements. A description of the levels of implementation is: Level 0 The component is not in place at all or there are major inconsistencies in implementation. Level 1 The component is in place but there are minor inconsistencies in implementation. Level 2 The component is fully in place and effectively implemented. Level 3 The component is fully in place, effectively implemented and exhibits improvement in execution over the past 12 months. A procedure for evaluation and scoring of each component will be included in the SAE J4001 Implementation of Lean Operations User Manual.

SAE J 4000-1999由美国机动车工程师协会 US-SAE 发布于 1999-08-01。

SAE J 4000-1999 在中国标准分类中归属于: T02 经济管理,在国际标准分类中归属于: 03.100.50 生产、生产管理。

SAE J 4000-1999 发布之时,引用了标准

  • ISO 9001-1994 质量系统.设计研制、生产、装配和维修的质量认证规范
  • SAE J 4001 实行精益运营的用户手册*1999-11-01 更新

* 在 SAE J 4000-1999 发布之后有更新,请注意新发布标准的变化。

SAE J 4000-1999的历代版本如下:

  • 1999年08月01日 SAE J 4000-1999 实行精益运营的最佳方法确认和测量

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 SAE J 4000-1999 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
SAE J 4000-1999
发布日期
1999年08月01日
实施日期
废止日期
中国标准分类号
T02
国际标准分类号
03.100.50
发布单位
US-SAE
引用标准
ISO 9001-1994 SAE J 4001 SAE AS 9000-1997 SAE AS 9000A-1998
适用范围
SAE J4000 is a tool to identify and measure best practice in the implementation of lean operation in a manufacturing organization. Implementation of lean operation is defined as the process of eliminating waste exhibited in an organizations value stream. Best practice in this process is Level 3 conduct as described in the standards component statements. A description of the levels of implementation is: Level 0 The component is not in place at all or there are major inconsistencies in implementation. Level 1 The component is in place but there are minor inconsistencies in implementation. Level 2 The component is fully in place and effectively implemented. Level 3 The component is fully in place, effectively implemented and exhibits improvement in execution over the past 12 months. A procedure for evaluation and scoring of each component will be included in the SAE J4001 Implementation of Lean Operations User Manual.

谁引用了SAE J 4000-1999 更多引用





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号