VDI 6026 Blatt 1-2008

Documentation in the building services - Contents and format of planning, execution and review documents


说明:

  • 此图仅显示与当前标准最近的5级引用;
  • 鼠标放置在图上可以看到标题编号;
  • 此图可以通过鼠标滚轮放大或者缩小;
  • 表示标准的节点,可以拖动;
  • 绿色表示标准:VDI 6026 Blatt 1-2008 , 绿色、红色表示本平台存在此标准,您可以下载或者购买,灰色表示平台不存在此标准;
  • 箭头终点方向的标准引用了起点方向的标准。

 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 VDI 6026 Blatt 1-2008 前三页,或者稍后再访问。

点击下载后,生成下载文件时间比较长,请耐心等待......

 



标准号
VDI 6026 Blatt 1-2008
发布日期
2008年05月
实施日期
废止日期
国际标准分类号
91.140.01
发布单位
DE-VDI
适用范围
This guideline describes the requirements, in terms of contents and format, to be met by the documents that are to be drafted in the course of the processing of a BS project (planning, execution or operation of a BS system). The required contents and format of the documents to be drafted in the course of project processing for the relevant parties involved (building owners/orderers, architects, specialist planners, contractors, operators, etc.) are pointed out. Rather than introducing new terminology in the context of the drafting of documents, this guideline makes use of the existing terms, already used particularly in the VOB or the HOAI, although these terms are mostly not defined in greater detail. This guideline does not stipulate independent, new obligations to draft the documents. However, this guideline does not merely describe the information content and format of the documents in each planning or execution phase, i. e. from a vertical perspective, but it also shows the interfaces between the respective BS trades from a horizontal perspective. The following BS trades are considered by this guideline: - Sewage, water and gas systems - Heat supply systems - Ventilating and air-conditioning systems - Cooling systems - Power systems - Telecommunications and IT systems - Conveying systems - Building automation and control systems (BACS). The planning including the associated description shall be checked for compliance with the respective functional planning specifications, approved and accepted by the orderer at the end of each planning phase.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号