4.1 This practice can be applied to the requirements for facility serviceability of many functional occupant groups, provided that an appropriate set of requirement classifications for each type has been established.
4.2 This practice can be applied to rating the facility serviceability of a building or building-related facility.
4.3 This practice can be used to ascertain the requirements of a group or organization at the time when the group (1) needs to ascertain the serviceability of the facility it occupies; (2) is contemplating a move and needs to assess the relative capability of several existing facilities to perform as required, before deciding to rent, lease, or buy; (3) needs to compare its requirements to the serviceability of a facility that is being planned, or is designed but is not yet built; (4) is planning to remodel or rehabilitate the space it occupies and needs to establish the required level of serviceability that the remodeled or rehabilitated facility will have to meet.
4.4 This practice is not affected by the complexity of the requirement for serviceability.
4.5 This practice can be used by any individual with sufficient organizational, functional, and technical knowledge of buildings to act as an informed facilitator. The individual charged with the task of leading the process of establishing the functional requirements of an occupant group or organization needs basic facilitation and interviewing skills. The individual charged with rating the serviceability of a building needs sufficient knowledge of buildings to identify the features that are present.
4.6 This practice provides a means of setting typical required serviceability levels for any serviceability topic, and of comparing the required levels of functionality for one occupant group or organization against levels set by others.
4.7 This practice provides a means for organizations to set a profile of functional requirements for each type of occupant group within that organization.
4.7.1 This practice provides a means for organizations to identify and validate exceptional needs of their occupants rapidly.
4.7.2 This practice provides a means of comparing the requirement levels of various occupant groups within an organization.
4.8 This practice provides a method for comparing how well an occupant's functional requirements match the capabilities of different buildings or facilities, despite differences such as location, structure, mechanical systems, age, and building shape.
4.9 This practice provides a framework that allows design professionals and facility managers to select the most cost-effective means of providing a facility that will best provide the required levels of serviceability.
4.10 This practice helps the occupants to understand how various functional requirements interact and impact on the overall serviceability of a building or building-related facility and on its level of serviceability for each topic.
关注 | 4月1日实施质量新规汇编 不仅仅质量经理需要
对没有可适用的埃及标准或埃及标准不能覆盖的产品,可采用其认可的6种国际标准(国际标准化组织(ISO)、国际电工委员会(IEC)、欧洲标准(EN)、美国国家标准学会标准(ANSI)、美国材料实验协会标准(ASTM)和日本工业标准(JIS))。根据上述方法仍无法确定检验标准的,可对照使用与国际标准等同或者等效的中国国家标准。日本新食品标示法今日实施4月1日起,日本新食品标示法将正式实施。...
九是加快垃圾分类处置装备设施项目建设。各地要参照《城市环境卫生设施规划规范》(GB50337—2003)、《环境卫生设施设置标准》(CJJ27—2012)等标准规范编制环境卫生设施专项规划,结合当地实际,统筹安排或调整城市生活垃圾收集、运输、处置设备设施的布局、用地和规模,确定各类环境卫生设施的种类、等级、数量、建筑面积、定点位置等内容,并纳入土地利用总体规划、城市总体规划和近期建设规划。...
内容包括:创造有利的投资环境,为建筑和基础设施的更新和维护提供贷款保障或项目债券,鼓励国家层面的激励机制,如降低增值税税率;提升劳动力资质和流动性,共享课程体系、就业市场、雇主需求等信息;加强资源有效性和环境保护;制定成员国统一的标准设计实施规范;培育欧洲建筑产业的全球地位,为第三国设立标准、树立表率。欧委会特地重申,将继续坚持保证对来自贸易协定伙伴国家公司的市场准入(包括政府采购市场)承诺。...
李先庭:疫情当下,为避免交叉感染,多个房间共用回风的中央空调使用时需要在加大新风量的同时关闭回风;对于无法加大新风量、必须使用回风的中央空调系统,应尽量在空调机组或回风口使用F7级以上的过滤器;考虑到全国大部分地区还处于供热期,加大新风量的同时还要保持室内温度,以维持人体基本的舒适性要求。 对于没有新风系统或新风量不足的建筑,建议定时开窗通风,有条件时开启排风系统。...
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号