93.020 土方工程、挖掘、地基构造、地下工程 标准查询与下载



共找到 1822 条与 土方工程、挖掘、地基构造、地下工程 相关的标准,共 122

1.1 This guide provides recommended designs and procedures for the fabrication, installation, operation, and reading of settlement point(s) to determine the magnitude and rate of foundation, fill settlements, or both generally under a fill or embankment load. Two types of settlement points are described – those being monitored by elevation surveys from an external bench mark and those that include an internal reference system supported on unyielding soil or rock beneath the compressible layer(s) of interest. 1.2 Units—The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.3 This guide offers an organized collection of information or a series of options and does not recommend a specific course of action. This document cannot replace education or experience and should be used in conjunction with professional judgement. Not all aspects of this guide may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project’s many unique aspects. The word “standard” in the title of this document means only that the document has been approved through the ASTM consensus process. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Standard Guide for Installing and Operating Settlement Points for Monitoring Vertical Deformations

ICS
93.020
CCS
发布
2019-11-01
实施

This document specifies the measurement of stress changes by means of total pressure cells (TPC). General rules of performance monitoring of the ground, of structures interacting with the ground, of geotechnical fills and of geotechnical works are presented in ISO 18674-1. If applied in conjunction with ISO 18674-4, this document allows the determination of effective stress acting in the ground. This document is applicable to: — monitoring changes of the state of stress in the ground and in geo-engineered structures (e.g. in earth fill dams or tunnel lining); — monitoring contact pressures at the interface between two media (e.g. earth pressure on retaining wall; contact pressure at the base of a foundation); — checking geotechnical designs and adjustment of construction in connection with the Observational Design procedure; — evaluating stability during or after construction. Guidelines for the application of TPC in geotechnical engineering are presented in Annex B. NOTE This document fulfils the requirements for the performance monitoring of the ground, of structures interacting with the ground and of geotechnical works by the means of total pressure cells as part of the geotechnical investigation and testing according to EN 1997-1[1] and EN 1997-2[2].

Geotechnical investigation and testing — Geotechnical monitoring by field instrumentation — Part 5: Stress change measurements by total pressure cells (TPC)

ICS
93.020
CCS
发布
2019-10-10
实施

Standard Test Method for Permeability of Granular Soils (Constant Head)

ICS
93.020
CCS
发布
2019-10-01
实施

本标准是根据中国建筑业协会《关于开展第一批团体标准编制工作的通知》(建协函[2018]7号文)的要求,由中冶京诚工程技术有限公司会同相关参编单位共同编制。在编制过程中,本规范编制组经广泛调查研究,认真总结了近年来装配式钢制波纹管综合管廊建设中的经验,参考有关综合管廊及钢波纹管公路桥涵国家地方标准,并在广泛征求意见的基础上完成。 本标准共分6章和3个附录,主要技术内容有:总则,术语和符号,基本规定,设计,施工与验收,运行与维护。3个附录分别为装配式钢制波纹管综合管廊常用选型表、常用波纹钢截面特性及密封带性能指标。

Technical Specification for Fabricated Corrugated Steel Utility Tunnel Engineering

ICS
93.020
CCS
E489
发布
2019-09-25
实施
2020-03-31

本规程共分7章和5个附录,主要内容包括:总则、术语和符号、基本规定、仪器设备和传感光缆、传感光缆的布设、现场测试、数据处理和测试报告等。

Technical specification for pile distributed fiber optic testing

ICS
93.020
CCS
M30/49
发布
2019-09-10
实施
2020-03-01

目 次 1 范 围 2 规范性引用文件 3 术语和定义 4 基本规定 5 设 计 5.1 一般要求 5.2 构造要求 6 安 装 6.1 一般要求 6.2 安装准备  6.3 钢围檩安装 6.4 支撑钢管安装 8 监 测 8.1 一般规定 8.2 监测控制要点 8.3 监测数据处理  9 验 收 9.1 一般规定 9.2 质量验收 附录A(资料性附录)钢支撑组成主要构件示意图 附录B(资料性附录)钢支撑工程检验批质量验收记录表

Technical specification for steel pipe support system for foundation pit engineering

ICS
93.020
CCS
E489
发布
2019-09-10
实施
2019-09-23

Standard Test Method for Expansion Index of Soils

ICS
93.020
CCS
发布
2019-09-01
实施

1.1 This test method covers the determination of the toluene insoluble sediment contained in Moellon. This test method was derived from Test Method D473. 1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Standard Test Method for Determination of Sediment in Moellon

ICS
93.020
CCS
发布
2019-09-01
实施

1   Scope This document establishes the specifications for the execution of static pile load tests in which a single pile is subjected to an axial static load in compression in order to define its load-displacement behaviour. This document is applicable to vertical piles as well as raking piles. All types of piles are covered by this document. The tests considered in this document are limited to maintained load tests. Pile load tests with constant penetration rate and cyclic load tests are not covered by this document. NOTE This document is intended to be used in conjunction with EN 1997-1. EN 1997-1 provides numerical values of partial factors for limit states and of correlation factors to derive characteristic values from static pile load tests to be taken into account in design. This document provides specifications for the execution of static axial pile load tests: a) checking that a pile will behave as designed; b) measuring the resistance of a pile.

Geotechnical investigation and testing. Testing of geotechnical structures - Testing of piles: static compression load testing

ICS
93.020
CCS
发布
2019-08-31
实施
2019-08-31

Construction technical specifications for geological disaster control engineering

ICS
93.020
CCS
P13
发布
2019-08-30
实施
2019-09-30

Technical specification for engineering design of geological disaster control

ICS
93.020
CCS
P13
发布
2019-08-30
实施
2019-09-30

Technical Specifications for Supervision of Geological Hazard Control Engineering

ICS
93.020
CCS
P13
发布
2019-08-30
实施
2019-09-30

Code for civil air defense design of underground utility corridor

ICS
93.020
CCS
P 18
发布
2019-08-21
实施
2019-10-01

本标准适用于山东省内复合土钉墙基坑支护工程的设计、施工、检验和监测。

Composite soil nail wall foundation pit support technical standard

ICS
93.020
CCS
P22
发布
2019-08-15
实施
2019-12-01

目 次 1 范围 2 规范性引用文件 3 术语和定义 4 一般要求 5 设计 5.1 一般规定 5.2 强夯法 5.3 强夯置换法 6 施 工 6.1 施工准备  6.2 主要施工机具与设备 6.3 施工程序 7 检测与验收 7.1 质量验收 7.2 资料

Technical specifications for dynamic compaction foundation treatment

ICS
93.020
CCS
E489
发布
2019-07-09
实施
2019-08-01

本规程的主要内容是:总则、术语和符号、基本规定、构造、设计、施工、检验与验收。

Technical specification for multi-belled-knot cast-in-place pile Foundation Drilled by Rotary cutting Arms

ICS
93.020
CCS
P22
发布
2019-07-02
实施
2020-01-01

本规程共分7章和5个附录,主要技术内容包括:总则、术语和符号、基本规定、孔深、孔径、垂直度、沉渣厚度等。

Technical specification for testing of borehole of cast-in-place piles

ICS
93.020
CCS
M00/09
发布
2019-06-26
实施
2019-12-01

1  总  则  2  术语和符号  2.1  术  语  2.2  符  号  3  基本规定  4  混凝土预制板材  4.1  一般规定  4.2  混凝土 4.3  钢  材  4.4  构  件  4.5  连接件  5  设  计  5.1  一般规定  5.2  基坑围护墙  5.3  两墙合一  6  施  工  6.1  一般规定  6.2  成墙施工  6.3  两墙合一  6.4  监测和环境保护  7  质量检查和验收  7.1  混凝土预制板材  7.2  现场施工  附录A  混凝土预制板材截面参数及力学性能  附录B  混凝土预制板材连接构造  附录C  TAD墙施工记录表  附录D  TAD墙检验批质量验收记录表  本规程用词说明  引用标准名录 

Technical Specification for Trench Cutting Assemble Diaphragm Wall

ICS
93.020
CCS
E481
发布
2019-06-10
实施
2019-07-02

本规程适用于水泥土插芯组合桩复合地基的而设计、施工、质量检验与验收。

Technical specifications for composite foundation of cement-soil core-inserted piles

ICS
93.020
CCS
P66
发布
2019-06-03
实施
2019-10-01

本规程适用于水泥土复合混凝土空心桩基础的设计、施工、质量检验与验收。

Technical specification for cement-soil composite concrete hollow pile foundation

ICS
93.020
CCS
P66
发布
2019-06-03
实施
2019-10-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved